Joint operation of TSTA under the collaboration between JAERI and DOE - TSTA loop run October 1990 - from Oct. 1990 Tritium run test plan and result, TTA-TP-100-19.
Saved in:
| Format: | Book |
|---|---|
| Published: |
[s.l.] :
[s.n.],
1993.
|
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items: Joint operation of TSTA under the collaboration between JAERI and DOE - TSTA loop run October 1990 - from Oct. 1990 Tritium run test plan and result, TTA-TP-100-19.
- Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE -TSTA extended loop operation with 100 grams of Tritium on Apr.-May 1992-.
- Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE -Detail performance of the J-FCU [25 days extended TSTA loop operation on April-May 1992]-.
- Joint operation of the TSTA with the J-FCU under the collaboration between JAERI and U.S.-DOE -A first integrated Tritium test between J-FCU and ISS on Oct. 1991-.
- Running Linux.
- Tsta/fcu-jfcu tritium experiment on breeding blanket interface under the collaboration of jaeri-us/doe [extended annex IV]-march 1993-.
- 123 run, 41 programas prácticos Lotus 123.