Similar Items: The examination of the ruptures zircaloy-2 pressure tube from pickering NGS unit 2.
- An overview of the examination of fuel as follow-up to the 1988 november overpower transient in pickering NGS-A unit 1.
- AECB staff annual report on pickering NGS for the year 1989.
- Metallographic preparation of Zr-2.5Nb pressure tube material for examination on inclusions.
- The formation and characteristic of hydride blisters in c.w. Zircaloy-2 pressure tubes.
- Reduction of pressure-tube/Calandria-tube contact conductance Test-Mesh2.
- Deformation and rupture behavior of Argentine Zircaloy-4 cladding tubes in the temperature range from 700 to 1200ºC at different heating rates in inert atmosphere.
Author: Cheadle, B. A.
- The examination of the ruptures zircaloy-2 pressure tube from pickering NGS unit 2.
- Improving the service life and performance of CANDU fuel channels.
- Improving the service life and performance of CANDU fuel channels.
- CANDU fuel channels.
- Assesment of the integrity of KANUPP [KArachi NUclear Power Plant] fuel channels.