Similar Items: Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE -Detail performance of the J-FCU [25 days extended TSTA loop operation on April-May 1992]-.
- Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE -TSTA extended loop operation with 100 grams of Tritium on Apr.-May 1992-.
- Joint operation of the TSTA with the J-FCU under the collaboration between JAERI and U.S.-DOE -A first integrated Tritium test between J-FCU and ISS on Oct. 1991-.
- Tsta/fcu-jfcu tritium experiment on breeding blanket interface under the collaboration of jaeri-us/doe [extended annex IV]-march 1993-.
- Joint operation of TSTA under the collaboration between JAERI and DOE - TSTA loop run October 1990 - from Oct. 1990 Tritium run test plan and result, TTA-TP-100-19.
- JAERI fuel cleanup system [J-FCU] stand-alone Tritium test at the TSTA -J-FCU Tritium test with full impurities on Feb., 1992-.
- JAERI Fuel cleanup system [J-FCU] stand-alone Tritium test at the TSTA -first J-FCU test with one gram of tritium on june 1991-.