Similar Items: JAERI fuel cleanup system [J-FCU] stand-alone Tritium test at the TSTA -J-FCU Tritium test with full impurities on Feb., 1992-.
- JAERI Fuel cleanup system [J-FCU] stand-alone Tritium test at the TSTA -first J-FCU test with one gram of tritium on june 1991-.
- Joint operation of the TSTA with the J-FCU under the collaboration between JAERI and U.S.-DOE -A first integrated Tritium test between J-FCU and ISS on Oct. 1991-.
- Tests of the JAERI fuel cleanup system with Deuterium at the Tritium systems test assembly: - JFCU stand alone Deuterium test; JFCU stand alone Deuterium test 2 - .
- Test of the scroll pump in the Jaeri fuel cleanup system in the tritium systems test assembly -JFCU scroll pump test and result- -JFCU stand alone tritium test 2-.
- Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE -Detail performance of the J-FCU [25 days extended TSTA loop operation on April-May 1992]-.
- Test of the palladium diffuser in the JAERI fuel cleanup system in the Tritium systems test assembly.